NSF Certified Products - Public Water Supply System Components
These Listings were Last Updated on Friday, November 20, 2009 at 4:15 AM Eastern Time.
Please contact NSF International to confirm the status of any Listing, report errors, or make suggestions.

Warning: NSF is concerned about fraudulent downloading and manipulation of website text. If you have received this listing in hard copy, always confirm this certification/listing information by going directly to http://www.nsf.org/Certified/PwsComponents/Listings.asp?Company=00190&Standard=061& for the latest most accurate information.


NSF/ANSI STANDARD 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing.  Click here for a list of Abbreviations used in these Listings.


 
3M / CORROSION PROTECTION PRODUCTS 
6801 RIVER PLACE BOULEVARD
BUILDING A147-4N-01 
AUSTIN, TX 78726-9000 
512-984-5684
Visit this company's website

Facility : MINNETONKA, MN

Protective (Barrier) Materials

      Water Water
    Water Contact Contact Contact
  Trade Designation Size Restriction Temp Material

Coatings - Fittings
  ScotchKote 306[1] [2] CLD 23 EPOXY
  ScotchKote 314[1] [2] CLD 23 EPOXY
  ScotchKote 323[3] >= 2" CLD 23 EPOXY
  ScotchKote 323i[3] >= 2" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: None
    Final Cure Time and Temperature: 48 hours at 23°C
    Special Comments: Mix ratio of A:B is 1:1 by weight.
[2] Fitting interior surfaces not to exceed 5% of fitting with an interior diameter of 4"
    and greater.
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 30
    Maximum Thinner: None
    Final Cure Time and Temperature: 120°F for 2 hours
    Special Comments: Mix ratio of A:B is 2:1 by volume.

Coatings - Pipe
  ScotchKote 306[1] [4] CLD 23 EPOXY
  ScotchKote 314[1] [4] CLD 23 EPOXY
  ScotchKote 323[3] >= 2" CLD 23 EPOXY
  ScotchKote 323i[3] >= 2" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: None
    Final Cure Time and Temperature: 48 hours at 23°C
    Special Comments: Mix ratio of A:B is 1:1 by weight.
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 30
    Maximum Thinner: None
    Final Cure Time and Temperature: 120°F for 2 hours
    Special Comments: Mix ratio of A:B is 2:1 by volume.
[4] Pipe and circumferential pipe field welds with a maximum use not to exceed 5% of the
    surface area of any section of pipe 72 inches or greater in diameter.

Coatings - Tank
  ScotchKote 306[1] [5] CLD 23 EPOXY
  ScotchKote 314[1] [5] CLD 23 EPOXY
  ScotchKote 323[3] >= 50 gal. CLD 23 EPOXY
  ScotchKote 323i[3] >= 50 gal. CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: None
    Final Cure Time and Temperature: 48 hours at 23°C
    Special Comments: Mix ratio of A:B is 1:1 by weight.
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 30
    Maximum Thinner: None
    Final Cure Time and Temperature: 120°F for 2 hours
    Special Comments: Mix ratio of A:B is 2:1 by volume.
[5] Tank interior surfaces not to exceed 5% of tanks 4000 gallons or greater.

Coatings - Valve
  ScotchKote 323[3] >= 2" CLD 23 EPOXY
  ScotchKote 323i[3] >= 2" CLD 23 EPOXY

[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 30
    Maximum Thinner: None
    Final Cure Time and Temperature: 120°F for 2 hours
    Special Comments: Mix ratio of A:B is 2:1 by volume.


Facility : NEW ULM, MN

Protective (Barrier) Materials

      Water Water
    Water Contact Contact Contact
  Trade Designation Size Restriction Temp Material

Coatings - Fittings
  ScotchKote 134[1] >= 1/2" D. HOT PEC
  ScotchKote 206N[2] >= 4" D. HOT PEC
  ScotchKote 206N Extra LG[2] >= 4" D. HOT PEC
  ScotchKote 206N Fluid Bed[2] >= 4" D. HOT PEC
  ScotchKote 206N Long Gel[2] >= 4" D. HOT PEC
  Scotchkote 6233-11G[4] >= 1/2" D. HOT PEC
  Scotchkote 6233-4G[4] >= 1/2" D. HOT PEC
  Scotchkote 6233-8G[4] >= 1/2" D. HOT PEC

[1] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils) 12
    Maximum Thinner: None
    Recoat/Cure Thinner: 25 minutes at 425°F
[2] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 14
    Maximum Thinner: None
    Recoat/Cure Time: 180 seconds at 400°F
[4] Colors: Dark green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum Thinner: None
    Final Cure Time and Temperature: 6233-4G: 40 seconds at 450°F; 6233-8G: 90 seconds at
    450°F; 6233-11G: 110 seconds at 450°F
    Special Comments: Preheat part to 425-488° F before application of powder.

Coatings - Pipe
  ScotchKote 134[1] >= 1/2" D. HOT PEC
  ScotchKote 206N[2] >= 4" D. HOT PEC
  ScotchKote 206N Extra LG[2] >= 4" D. HOT PEC
  ScotchKote 206N Fluid Bed[2] >= 4" D. HOT PEC
  ScotchKote 206N Long Gel[2] >= 4" D. HOT PEC
  Scotchkote 6233-11G[4] >= 1/2" D. HOT PEC
  Scotchkote 6233-4G[4] >= 1/2" D. HOT PEC
  Scotchkote 6233-8G[4] >= 1/2" D. HOT PEC

[1] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils) 12
    Maximum Thinner: None
    Recoat/Cure Thinner: 25 minutes at 425°F
[2] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 14
    Maximum Thinner: None
    Recoat/Cure Time: 180 seconds at 400°F
[4] Colors: Dark green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum Thinner: None
    Final Cure Time and Temperature: 6233-4G: 40 seconds at 450°F; 6233-8G: 90 seconds at
    450°F; 6233-11G: 110 seconds at 450°F
    Special Comments: Preheat part to 425-488° F before application of powder.

Coatings - Pump
  ScotchKote 134[1] [3] D. HOT PEC
  ScotchKote 206N[2] >= 2" D. HOT PEC
  ScotchKote 206N Extra LG[2] >= 2" D. HOT PEC
  ScotchKote 206N Fluid Bed[2] >= 2" D. HOT PEC
  ScotchKote 206N Long Gel[2] >= 2" D. HOT PEC

[1] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils) 12
    Maximum Thinner: None
    Recoat/Cure Thinner: 25 minutes at 425°F
[2] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 14
    Maximum Thinner: None
    Recoat/Cure Time: 180 seconds at 400°F
[3] Surface area/volume ratio should be no greater than 122.1 sq. in./L.

Coatings - Valve
  ScotchKote 134[1] >= 1/2" D. HOT PEC
  ScotchKote 206N[2] >= 2" D. HOT PEC
  ScotchKote 206N Extra LG[2] >= 2" D. HOT PEC
  ScotchKote 206N Fluid Bed[2] >= 2" D. HOT PEC
  ScotchKote 206N Long Gel[2] >= 2" D. HOT PEC

[1] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils) 12
    Maximum Thinner: None
    Recoat/Cure Thinner: 25 minutes at 425°F
[2] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 14
    Maximum Thinner: None
    Recoat/Cure Time: 180 seconds at 400°F


Facility : NORTH YORKSHIRE, UNITED KINGDOM

Protective (Barrier) Materials

      Water Water
    Water Contact Contact Contact
  Trade Designation Size Restriction Temp Material

Coatings - Fittings
  GeoPox GX014[1] >= 2" CLD 23 EPOXY
  Scotchkote 162PWX[2] >= 4" CLD 23 EPOXY

[1] Colors: Pink
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40 (1.0mm)
    Maximum Thinner: None
    Final Cure Time and Temperature: 16 hours at 3°C
    Special Comments: A 1 hour flush at 5 gallons per minute is required prior to being
    placed into service.  Mix ratio of Part A:Part B is 2.4:1 by weight.  Disinfect with 50
    ppm residual chlorine.
[2] Colors: Pale gray or water industry blue
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40
    Final Cure Time and Temperature: 16 hours at 3°C for repairing pipe and 20°C for use on
    new pipe.
    Special Comments: Mix ratio Part A:B is 2:1.  One hour flush is required prior to being
    placed into service.

Coatings - Pipe - Immediate Return to Service
  3M™Scotchkote™Spray in Place Pipe 269 Coating[3] [5] >= 4" CLD 23 PUA
  GeoPox GX014[1] [3] >= 12" CLD 23 EPOXY
  Scotchkote 162PWX[2] >= 1" CLD 23 EPOXY
  Scotchkote 169[3] [4] >= 4" CLD 23 PUR

[1] Colors: Pink
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40 (1.0mm)
    Maximum Thinner: None
    Final Cure Time and Temperature: 16 hours at 3°C
    Special Comments: A 1 hour flush at 5 gallons per minute is required prior to being
    placed into service.  Mix ratio of Part A:Part B is 2.4:1 by weight.  Disinfect with 50
    ppm residual chlorine.
[2] Colors: Pale gray or water industry blue
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40
    Final Cure Time and Temperature: 16 hours at 3°C for repairing pipe and 20°C for use on
    new pipe.
    Special Comments: Mix ratio Part A:B is 2:1.  One hour flush is required prior to being
    placed into service.
[3] Evaluated for Immediate Return to Service.
[4] Colors: Light gray
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 80
    Maximum Thinner: None
    Recoat/Cure Time: 30 minutes at 30°C
    Special Comments: Mix ratio of A:B is 2.5:1.  One hour flush required prior to being
    placed into service.
[5] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 276
    Final Cure Time and Temperature: 1 hour at 3°C	
    Special Comments: Mix ratio of Part A:Part B is 1:1 by volume; Disinfect with 50 ppm
    chlorine and then flush for 1 hour at 5 gallons/minute.  Certified for dry film
    thickness (DFT) of 39-276 mils.

Coatings - Tank
  Scotchkote 162PWX[2] >= 100 gal. CLD 23 EPOXY

[2] Colors: Pale gray or water industry blue
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40
    Final Cure Time and Temperature: 16 hours at 3°C for repairing pipe and 20°C for use on
    new pipe.
    Special Comments: Mix ratio Part A:B is 2:1.  One hour flush is required prior to being
    placed into service.

Coatings - Valve
  Scotchkote 162PWX[2] >= 4" CLD 23 EPOXY

[2] Colors: Pale gray or water industry blue
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 40
    Final Cure Time and Temperature: 16 hours at 3°C for repairing pipe and 20°C for use on
    new pipe.
    Special Comments: Mix ratio Part A:B is 2:1.  One hour flush is required prior to being
    placed into service.


Number of matching Manufacturers is 1
Number of matching Products is 48
Processing time was 1 seconds